New TAS Prunéřov Source – Gas and Biomass Boiler Plant


Customer: DT Energie Tech, s. r. o.


19.05.2026 Key ongoing projects #zvvzengineering

Supplier: ZVVZ ENGINEERING, a. s.

Customer: DT Energie Tech, spol. s. r. o.

Operator: ČEZ Teplárenská a. s.

Scope of work: Manufacture, supply and installation of a technological system for flue gas extraction and cleaning from the biomass boiler plant, including fly ash removal systems, electrical systems and I&C (measurement and control), insulation, and auxiliary technologies at the existing Prunéřov II Power Station site. The scope of work also includes preparation of design and manufacturing documentation as well as as-built documentation.

Deadline for handover of the works for use: 20. 1. 2028